What is the Meter Disconnection registration?
Meter Disconnection registration is for individuals currently working as a Service Layer or Main Layer who are required to disconnect gas meters as part of their role, and is available to individuals who hold one of the following:
- Energy & Environment Awards Level 2 Diploma in Network Construction Operations (Gas) – Service Layer
- City & Guilds Level 2 Diploma in Network Construction Operations (Gas)
- Gas Network Team Leader Level 2 Apprenticeship – Service Layer
- Gas Network Operative (GNO) Level 2 Apprenticeship
- ERS Certification – Gas Meter Disconnection
Evidence requirements
Energy & Environment Awards Level 2 Diploma in Network Construction Operations (Gas)
A colour photo or colour scanned image of the original certificate for Service Layer
Plus, the following unit:
- 1627 Disconnection of Gas Meters and Regulators, or
- 1100 Disconnection of Gas Meters and Regulators
City & Guilds Level 2 Diploma in Network Construction Operations (Gas)
A colour photo or colour scanned image of the original certificate for Service Layer or Main Layer
Plus, the following unit:
- 219 – Disconnection of Meters
IFATE Gas Network Team Leader Level 2 Apprenticeship
A colour photo or colour scanned image of the original certificate for Service Layer
IFATE Gas Network Operative Level 2 Apprenticeship
A colour photo or colour scanned image of the original certificate
ERS Certification – Gas Meter Disconnection
A colour photo or colour scanned image of the original certificate
Pre-requisites
All individuals must hold the specified NCO (Gas) Service Layer or NCO (Gas) Main Layer as shown above.
Individuals must also hold a valid EUSR registration for SHEA Gas.
For Meter Disconnection registration, the individual’s employer must hold a Gas Safe business registration that includes ‘Meter Disconnection’ as required by HSE/Gas Safe. Additionally, at least one appropriately qualified individual must be listed on EUSR and the Gas Safe Register. For businesses or employers using this registration route, please refer to the Meter Disconnection page for detailed requirements and processes.