What is the Meter Disconnection registration?
Meter Disconnection registration is for individuals currently working as a Service Layer or Main Layer who are required to disconnect gas meters as part of their role, and is available to individuals who hold one of the following:
- Energy & Environment Awards Level 2 Diploma in Network Construction Operations (Gas) – Service Layer
- City & Guilds Level 2 Diploma in Network Construction Operations (Gas)
- Gas Network Team Leader Level 2 Apprenticeship – Service Layer
- Gas Network Operative (GNO) Level 2 Apprenticeship
- ERS Certification – Gas Meter Disconnection
Evidence requirements
Energy & Environment Awards Level 2 Diploma in Network Construction Operations (Gas)
A colour photo or colour scanned image of the original certificate for Service Layer
Plus, the following unit:
- 1627 Disconnection of Gas Meters and Regulators, or
- 1100 Disconnection of Gas Meters and Regulators
City & Guilds Level 2 Diploma in Network Construction Operations (Gas)
A colour photo or colour scanned image of the original certificate for Service Layer or Main Layer
Plus, the following unit:
- 219 – Disconnection of Meters
Skills England Gas Network Team Leader Level 2 Apprenticeship
A colour photo or colour scanned image of the original certificate for Service Layer
Skills England Gas Network Operative Level 2 Apprenticeship
A colour photo or colour scanned image of the original certificate
ERS Certification – Gas Meter Disconnection
A colour photo or colour scanned image of the original certificate
Pre-requisites
All individuals must hold the specified NCO (Gas) Service Layer or NCO (Gas) Main Layer as shown above.
Individuals must also hold a valid EUSR registration for SHEA Gas.
For Meter Disconnection registration, the individual’s employer must hold a Gas Safe business registration that includes ‘Meter Disconnection’ as required by HSE/Gas Safe. Additionally, at least one appropriately qualified individual must be listed on EUSR and the Gas Safe Register.
Individuals holding EUSR Meter Disconnection registration are required to also re-register for Meter Disconnection at the same time as re-registering their NCO (Gas) Service Layer or Main Layer registration(s). Where both are applied for at the same time, only a single registration fee is charged.